Skip to main content
    Property Law

    Verifying Building Plan vs Floor Counts in Bangalore

    By Advocate Raghavendra S C August 7, 2026 12 min read
    Verifying Building Plan vs Floor Counts in Bangalore

    Quick Answer

    What Legal Checks Are Needed When the Approved Building Plan Shows Fewer Floors Than the Building That Was Actually Constructed in Bangalore? By the Property Law Team | Legal Brigade | Bar Council of Karnataka When a Bangalore apartment building was constructed with more floors than the BBMP-sanctioned building plan permits – either because the…

    What Legal Checks Are Needed When the Approved Building Plan Shows Fewer Floors Than the Building That Was Actually Constructed in Bangalore?

    By the Property Law Team | Legal Brigade | Bar Council of Karnataka

    When a Bangalore apartment building was constructed with more floors than the BBMP-sanctioned building plan permits – either because the developer added additional floors beyond the sanctioned height during construction without obtaining a revised building plan sanction, because the sanctioned plan was for a lower-height building and the developer exceeded the permitted Floor Area Ratio by constructing additional floors, or because the additional floors were constructed after the OC was obtained for the originally sanctioned floors – the additional floors are an unauthorised construction that BBMP can direct to be demolished, the OC for the additional floors is either non-existent or has been obtained fraudulently and every flat owner on the additional floors holds a flat in a structure with no valid legal basis for its existence as an approved building.

    How Do Additional Unauthorised Floors Arise in Bangalore Apartment Buildings?

    Additional unauthorised floors in Bangalore apartment buildings arise through three common mechanisms. First, during construction the developer calculates that demand is strong enough to justify additional floors and simply builds beyond the sanctioned height without obtaining a revised plan sanction – the contractor builds the additional floors, the sub-registrar registers sale deeds for the additional floor flats without checking the plan, and the building stands with floors that were never sanctioned. Second, the developer obtains the OC for the originally sanctioned floors and then constructs additional floors as a post-OC addition – which is an entirely new construction on top of a certified building that requires its own building plan sanction and structural assessment.

    Third, the developer manipulates the BBMP building plan process – obtaining a sanction for the maximum permitted height, constructing additional floors beyond that height with the intention of compounding the violation later. Compounding is BBMP’s process for regularising unauthorised constructions on payment of a penalty – but compounding has limits, and floors that exceed the permitted FAR significantly or violate the setback rules may be outside the compoundable range. Buyers who purchase on the compounded floors have a regularised flat – buyers on floors that were never compounded hold flats with no legal sanction.

    Table 1: Unauthorised Additional Floor Risks for Flat Buyers

    Floor Status

    BBMP Legal Position

    OC Position

    Risk for Buyer on That Floor

    Floor within sanctioned plan – OC obtained

    Fully authorised – no deviation

    Valid OC covers this floor

    Minimal – standard building compliance position

    Additional floor added during construction – no revised plan – OC obtained by misrepresentation

    Unauthorised addition – BBMP was misled into issuing OC

    OC is fraudulently obtained – BBMP can cancel it

    Very high – the flat is on a floor with no valid sanctioned basis – demolition order risk

    Additional floor added post-OC – no new plan sanction

    Unauthorised post-OC addition – entirely new construction on certified building

    Original OC does not cover this floor – no valid OC for the addition

    Very high – the flat is in a structure built without any sanction or OC

    Additional floor constructed – compounding application filed and approved

    Compounding regularises the violation – BBMP accepts the deviation on payment

    Revised OC may cover the compounded floor

    Low – if compounding was genuinely approved and the revised OC covers the floor

    Additional floor constructed – compounding refused – beyond permissible FAR

    Unauthorised construction that BBMP cannot regularise

    No OC possible for this floor

    Very high – BBMP is obligated to direct demolition of floors beyond the permissible FAR

    How Do I Confirm the Building Plan Matches the Physical Building Before Buying?

    Step 1: Obtain the BBMP-sanctioned building plan and count the number of floors shown in the plan’s elevation drawing. Confirm the floor count matches the plan’s description of the building – ground floor plus the specified number of upper floors.

    Step 2: Physically count the floors of the building during the site visit. Compare the physical floor count against the sanctioned plan’s floor count. Any difference requires immediate investigation.

    Step 3: Confirm the OC covers the specific floor on which the flat being purchased is located. An OC issued for a ground plus five floor building does not cover a flat on the sixth floor if the sixth floor was not in the sanctioned plan.

    Step 4: Check whether any compounding application was filed with BBMP for the additional floors and whether BBMP approved the compounding and issued a revised OC covering the compounded floors.

    Step 5: Have a property lawyer compare the sanctioned plan floor count, the OC’s covered floors and the physical building’s actual floor count before any purchase commitment – particularly for flats on the upper floors of a building where extra floors are the most common form of unauthorised construction.

    Table 2: Building Plan vs Physical Floor Count Reconciliation

    Reconciliation Outcome

    What It Means

    Action Required

    Purchase Recommendation

    Sanctioned plan floor count matches physical building – OC covers all floors

    The building was constructed as approved – no deviation

    Standard compliance confirmation

    Proceed with standard verification

    Physical building has one extra floor – compounding approved – revised OC issued

    The deviation was regularised through BBMP’s compounding process

    Confirm the revised OC specifically covers the extra floor and the flat being purchased

    Proceed if the revised OC clearly covers the specific flat

    Physical building has one extra floor – no compounding application – OC for lower floors only

    The extra floor is unauthorised – the OC for the lower floors is clean but the extra floor has no sanction

    Do not purchase a flat on the extra floor – flats on the sanctioned floors may be purchasable with a price adjustment

    Avoid the extra floor – assess sanctioned floors case by case

    Physical building has two or more extra floors – no compounding – OC for lower floors only

    Multiple unauthorised floors – BBMP enforcement risk for the entire building including the sanctioned floors

    Assess whether BBMP’s enforcement action would affect the sanctioned floor flats

    Very high caution – the unauthorised floors create enforcement risk that affects the entire building

    Physical building matches the plan but OC was obtained before the top floor was completed

    The OC may have been issued prematurely – the top floor may not have been included in the OC inspection

    Confirm the OC inspection covered the top floor specifically

    Confirm the OC coverage before proceeding for top floor flats

    Frequently Asked Questions

    Q1. How can a developer build more floors than the sanctioned plan allows?

    A developer can physically build more floors than the sanctioned plan allows because the construction process is not continuously monitored by BBMP. BBMP’s building inspectors conduct periodic inspections at specific stages – foundation, plinth, superstructure – but do not monitor every floor’s addition in real time. A developer who builds additional floors quickly between inspection visits, or who manages the inspection process without disclosing the additional floors, can complete the unauthorised floors before BBMP identifies the deviation.

    Q2. Does the BBMP OC cover all floors of the building regardless of what was sanctioned?

    No – the BBMP OC is issued for the building as described in the sanctioned plan. An OC for a ground plus five floor building covers only those six floors. If the building physically has a seventh floor that was not in the sanctioned plan, the OC does not cover the seventh floor – even if the OC was issued after the seventh floor was built. A flat on the seventh floor in this scenario is in a structure with no valid OC.

    Q3. What is BBMP compounding and can it regularise extra floors?

    BBMP compounding is a process for regularising unauthorised constructions on payment of a compounding fee. BBMP can compound deviations that are within the permissible limits – specifically, deviations that do not exceed the area’s permitted FAR, do not violate the setback requirements and do not exceed the permitted building height. Extra floors that push the building beyond the permitted FAR cannot be compounded – BBMP is legally obligated to direct demolition of the non-compoundable portions. Whether a specific extra floor can be compounded depends on the building’s FAR consumption.

    Q4. Can a buyer on a sanctioned floor be affected by demolition of an extra floor above them?

    Yes – demolition of upper floors in a multi-storey building is a structurally complex operation that can affect the building’s structural integrity and the living conditions of all residents below the demolished floors. Additionally, if BBMP’s enforcement action includes a stop-work or vacation notice for the entire building – because the unauthorised floors create a safety concern – all flat owners including those on sanctioned floors are affected. The presence of unauthorised floors above sanctioned floors is a material risk for all buyers in the building.

    Q5. How does a home loan bank assess a flat in a building with extra unauthorised floors?

    A bank’s technical valuer who identifies a floor count discrepancy between the sanctioned plan and the physical building will flag it as an unauthorised deviation. The bank’s legal team will then assess whether the specific flat being financed is on a sanctioned floor or an unsanctioned floor. Banks typically refuse to lend on flats on unsanctioned floors and may also be cautious about lending on sanctioned floors in a building with significant unauthorised additions above them.

    Q6. What if the developer says the extra floors were added before the BBMP changed the FAR rules?

    A developer who claims extra floors were built when a higher FAR was permitted must produce the specific BBMP notification that permitted the higher FAR at the time of construction – and must show that the building plan was sanctioned under that notification. A building plan sanctioned under the current FAR rules cannot be retrospectively recalculated under a prior FAR regime. The claim must be verified against the actual sanction order and the FAR rules in force at the time of the sanction.

    Q7. Is it common for Bangalore apartment buildings to have extra unauthorised floors?

    Unauthorised additional floors are a known compliance issue in Bangalore – particularly in projects developed between 2005 and 2018 when the city’s rapid growth created demand pressure and enforcement was less systematic. Buildings in the inner ring road zone, established residential localities and the older IT corridors are the most common areas where this type of deviation is found. BBMP’s building plan compliance drive in recent years has identified and issued notices to many such buildings – making the floor count check an essential step for all Bangalore apartment purchases.

    Q8. What if the sale deed for a flat on an extra floor was registered by the sub-registrar?

    The sub-registrar’s registration of a sale deed does not validate the flat’s legal basis – the sub-registrar registers documents without checking whether the property described in the document is a sanctioned structure. A registered sale deed for a flat on an unauthorised floor is a registered document with an invalid property description – the flat does not legally exist as an approved structure. Registration confirms the document’s execution – it does not confirm the property’s legal status.

    Q9. Can the developer be held liable to buyers on extra floors if BBMP orders demolition?

    Yes – a buyer who purchased a flat on an extra floor that is subsequently demolished has a misrepresentation and breach of contract claim against the developer. The developer represented that the flat was a legal residential unit and sold it at a price that reflected that representation. If the flat is demolished, the developer must refund the purchase price with interest and compensate the buyer for consequential losses. This claim is enforceable through RERA if the project was RERA-registered, or through a civil suit for other projects.

    Q10. How does Legal Brigade check the floor count compliance during property verification?

    Legal Brigade’s building plan compliance check includes a comparison of the sanctioned plan’s floor count against the physical building’s actual floor count during the site visit, a review of the OC to confirm it covers all physically existing floors, a check for any BBMP deviation or compounding notice for the building and an assessment of whether the specific flat being purchased is on a sanctioned floor. Where a floor count discrepancy is identified, Legal Brigade advises on the risk level and the options available before any purchase commitment.

    Buying a flat in a Bangalore building that appears taller than similar buildings in the area? The sanctioned plan floor count check confirms whether your floor has a valid BBMP sanction and OC coverage.

    WhatsApp → wa.me/916360266840

    Frequently Asked Questions

    Developers may build extra floors because BBMP does not monitor construction in real time. They often complete unauthorised floors between periodic inspections or manage the inspection process without disclosing the additional height.

    Developers may build extra floors because BBMP does not monitor construction in real time. They often complete unauthorised floors between periodic inspections or manage the inspection process without disclosing the additional height.

    Does a BBMP Occupancy Certificate cover all floors automatically?

    No, an OC only covers the floors explicitly described in the sanctioned plan. If an OC is issued for five floors but the building has six, the sixth floor remains unauthorised and lacks a valid legal basis.

    What is compounding in the context of Bangalore property law?

    Compounding is a process where BBMP regularises certain unauthorised constructions upon payment of a penalty. However, floors that significantly exceed the permitted Floor Area Ratio or violate setback rules may be ineligible for regularisation.

    What are the risks of buying a flat on an unsanctioned additional floor?

    The primary risks include the lack of a valid OC and the potential for BBMP to issue a demolition order. Flats on unauthorised floors are considered non-existent in legal terms as they lack a sanctioned building basis.

    How can I verify the floor count before purchasing an apartment?

    You should physically count the building floors and compare them to the elevation drawing in the BBMP-sanctioned plan. Additionally, verify that the Occupancy Certificate specifically lists and covers the floor where your unit is located.

    Need a property document review in Bangalore?

    Talk to Legal Brigade. We respond within 5 minutes.

    Book a consultation →

    Need Help With Your Property Documents?

    Get a consultation with Legal Brigade. We'll review your documents and give you a clear legal opinion.